Year: 2017
Overview: As per the previous project with GLTM, ADCB was appointed the system installer and integrator for the installation of Erico’s System 3000 lightning protection systems, however in this case the works were conducted on Total’s offshore platform. The scope of the project included the Installation of the system and supply of Ancillaries at the top of a 64m Derrick & 7.7m Gin Pole on the offshore Jack Up Platform.

Show More
Project Details
Name Critec (Noble/Total) System 3000 Installation Date 11 Fri 2017 Author ad_admin