Project Description
| Client: | Progresif Cellular |
| Entity: | ADCB |
| Project Name: | 65m Guyed Mast, Turnkey Supply, Installation, Commissioning (Sg. Tujoh Immigration Post) |
| Year: | 2015 |
| Overview: | This project involved the turnkey delivery of a new 65m guyed mast at Brunei’s southernmost border with Miri. The mast’s foundation and steel structure were installed under difficult ground conditions at an aggressive seaside location. |