contact@alandick.com.bn   +673 233 8601 / +603 7885 9710

Project Description

Client: Progresif Cellular
Entity: ADCB
Project Name: 65m Guyed Mast, Turnkey Supply, Installation, Commissioning (Sg. Tujoh Immigration Post)
Year: 2015
Overview: This project involved the turnkey delivery of a new 65m guyed mast at Brunei’s southernmost border with Miri. The mast’s foundation and steel structure were installed under difficult ground conditions at an aggressive seaside location.

Show More
Project Details
Name 65m Guyed Mast, Turnkey Supply, Installation, Commissioning (Sg. Tujoh Immigration Post) Date 11 Fri 2017 Author ad_admin