Client: DST (NSC)
Entity: ADCB
Project Name: NSC-Installation of 45m Tower and Verticality Checks
Year: 2016-17
Overview: ADCB tower installation crews were approached to assist Nor Shaheeda Company with the erection of several 45m towers on their DST project. At the sites where the work was conducted there was no access for cranes. Hence ADCB’s specialised winch and derrick were used to complete the works. ADCB engineers also conducted verticality checks at 13 45m sites for NSC.