Project Description
Client: | Total (FOLEC) |
Entity: | ADCB |
Project Name: | FOLEC Total MW link (OPP-BAMB1) |
Year: | 2017 |
Overview: | During Q1 & Q2 2017, Alan Dick was appointed as rigging contractor to FOLEC Communications to implement and conduct BER tests on a new MW link between Bukit Ambok and Total Operations centre at Lumut. This project involved the design and fabrication of new mounts on the tower at BAMB1 and atop the operations centre inside. |