Project Description
Client: | GLTM/Keppel |
Entity: | ADCB |
Project Name: | GLTM-Keppel Sys3000 Singapore |
Year: | 2014 |
Overview: | ADCB was appointed the system installer and integrator for installation of Erico’s System 3000 lightning protection systems on dry dock rigs in Singapore and were required to meet all HSE and OH&S pre-requisites prior to implementation |